SolidWalk LT
(With Moisture Barrier, Lip & Tape) - Installation Instructions
|
| 2) Start in a corner. Unroll SolidWalk LT underlayment over subfloor with vapor barrier film (Logo Imprinted Side) up facing the ceiling. Be sure tape strip side is next to the wall and overlapping lip is toward the open room.(print) |





